BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in New Haven, Connecticut. Completed plans call for site work for a water / sewer project.

Cured-In-Place Pipe (CIPP) lining rehabilitation of approximately 2,734 feet of 42" sewer pipes along the Lower Mill River Interceptor located in Hamden, Connecticut. he proposed projects include: (1) SSR 2021-01: Cured-in-place pipe (CIPP) lining rehabilitation of approximately 2,734 feet of 42” sewer pipes along the Lower Mill River Interceptor located in Hamden, Connecticut. (2) SSR 2021-02: Cured-in-place pipe (CIPP) lining rehabilitation of approximately 2,261 feet of sewer mains of various sizes including 12”, 18”, 20”x30” brick sewers, and 30” RCP sewer mains located in New Haven, Connecticut.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
843
Active Projects
410
Bidding Soon
6,828
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2021

April 30, 2021

Project location map

To Be Determined, New Haven, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.