Site work for a water / sewer project in Tuscaloosa, Alabama. Working plans call for site work for a water / sewer project.

As of August 12, 2022, bids were rejected. No definite date for the rebid. Please contact the owner directly for post bid information. The Project shall be known as AMI 2021 Meter Change-Out Project Phase 1 and the general character of said public works project shall consist of the following: As coordinated between the City of Tuscaloosa and Contractor, Contractor shall, provide Technical, Labor and Data services to exchange/replace, retrofit existing water meters, with utility provided ( 1) water meters of same size and lay-length at assigned service locations including installation and programing ITRON 100W+ Water Pit Encoder with connectors. This installation shall be a through the lid. The approximate quantities of said Project are as follows: 1071 Each 5/8" water meters of same size and "lay-length" at assigned service locations. 349 Each 3/4" water meters of same size and "lay-length" at assigned service locations. 175 Each 1" water meters of same size and "lay-length" at assigned service locations. 150 Each utility provided meter boxes replaced on as-needed basis at the discretion of the utility. Special instructions are as follows: MBE/DBE/WBE Forms 1 & 2 are due to Caramyl Drake at cdrake@tuscaloosa.com no later than March 17th at 5:00 p.m.. Forms 3, 4, & 5 are due with your sealed bid. Bids not compliant with required forms will be deemed non-repsonsive. Please read the policy starting on page 102 carefully. The City will furnish the following: Water meters of same size and "lay-length" at assigned service locations, ITRON 100W+ Water Pit Encoders with connectors, meter boxes replaced on as-needed basis at the discretion of the utility. Time of Construction: From the date stated in the Notice to Proceed, the Project time of construction is 120 consecutive calendar days.

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Structure Moving, Contaminated Site Material Removal, Underground Storage Tank Removal
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Wood Stairs and Railings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Masonry Flooring, Wood Flooring, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Radiation Protection
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Termite Control, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
49
Bidding Soon
492
All Active Projects
224
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

February 13, 2023

img_map_placeholder

Multiple Locations, Tuscaloosa, AL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.