Published March 25, 2021 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Fort Worth, Texas. Completed plans call for site work for a water / sewer project.

The project scope includes, but is not limited to, the following major work items: Fill Operations to furnish, place, and compact fill material at designated site. Site Grading Proposals shall be accompanied by either a Bid Bond or certified check upon a national or statebank in an amount not less than 5% of the total maximum bid price, payable without recourse tothe Trinity River Authority of Texas as a guarantee that the bidder will, within 10 days after noticeof award, enter into a Contract and furnish a Performance Bond and Payment Bond upon theforms provided, each in the amount of 100% of the Contract Price, from a surety licensed toconduct business in Texas and named in the current "List of Certified Companies" as publishedin Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. Thesurety for the Performance Bond and Payment Bond shall have an "A" minimum rating ofperformance and a financial rating strength of five times the Contract Price, all as stated in thecurrent "Best's Key Rating Guide, Property-Casualty." Each Bond shall be accompanied by a"Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include thedate of the Bond. Direct All Questions Regarding Distribution or Design of Contract Documents for this project to Aaron Fricke, 817-445-1016, africke@cobbfendley.com or through CivCast.Questions sent by e-mail or through CivCast will be prioritized over those received by othermeans. Only responses issued via Addenda are binding. OWNER and ENGINEER shall each have the authority to reject Work which does not conform to the Contract Documents, and CONTRACTOR shall promptly correct all Work so rejected, whether observed before or after Final Acceptance and whether or not fabricated, installed or completed. CONTRACTOR shall bear all costs of correcting such rejected Work, and shall not be entitled toany increase in Contract Time or increase in Contract Sum for resulting delay, and shall, by appropriate Change Order, be charged for the cost of additional engineering services incurred by OWNER.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
332
Active Projects
43
Bidding Soon
3,967
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2021

April 26, 2021

Project location map

To Be Determined, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.