BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2021 at 8:00 PM

Updated January 26, 2024

Site work, paving and new construction of a civil project in Lake George, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; for the construction of a bridge / tunnel; and road / highway.

Projects: SAP 029-616-007, Construct Bridge 29535 on CSAH 16 over the Necktie River. 64' Span Pre-stressed Concrete Beam Bridge and Approach Grading. Approximate major items of work are: 1,390 CY of Common Borrow; 1,655 CY of Aggregate Base Class 5; 816 Tons of Type SP 12.5 Wearing Course Mix (2,C); 58 CY of Structural Concrete (3B52); 25,920 LBS of Reinforcement Bars (Epoxy Coated); 1 LS Structure Excavation; 2,316 SF of Bridge Slab Concrete (3YHPC-M); 261 LF of Prestressed Concrete Beams 27M; 1 LS Remove Existing Bridge; 150 SY of Bridge Approach Panels; 700 LF of C-I-P Concrete Piling 12"; 1 LS Traffic Control; 1 LS of Turf Establishment. Bids must be accompanied by a certified check or corporate surety bond made payable to the Hubbard County Treasurer for at least 5% of the total amount of bid in the proposal. The Hubbard County Board of Commissioners reserves the right to reject any or all bids and to waive any irregularities therein, and further reserves the right to award the Contract to serve the best interests of Hubbard County.

Award

Bridges / Tunnels

$715,346.00

Public - County

New Construction, Paving, Site Work

73

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
14
Bidding Soon
190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2021

June 1, 2021

Project location map

CSAH 16, Lake George, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.