BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated January 27, 2024

Demolition, site work, paving and new construction of a civil project in Montevideo, Minnesota. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

SAP 012-615-022: Grading, aggregate base, culvert replacement & bridge replacement (existing Br. 92625, New Br. 12J63) SAP 012-630-001: Grading and aggregate surfacing For SAP 012-615-022, a brief summary of major items of work include: Construction Surveying, Clearing and Grubbing, Building Removal, 7337 feet of Fence Removal, 963 feet of Remove Pipe Culverts, Remove 1 Bridge, 1641 SY Remove Bituminous Pavement, 73320 CY of Excavation-Common (P), 130736 Common Embankment (CV)(P), Test Rolling, 520 CY of Aggregate Surfacing, 10,900 gallons of Calcium Chloride Solution, 468 CY of Aggregate Base (CV) Class 5, 35655 SY Full Depth Reclamation, 124 ft of 8x6 Box Culverts, 68 ft of 12x5 Box Culverts, 544 ft of CS Pipe Culverts (15", 18", 24") with aprons, 340 ft of RC Pipe (18", 36" 51" arch, 58" arch) with aprons, 1 Drainage Structure Des 60-4020, 740 tons of Class III Riprap, 7226 ft of fencing (barbed wire and electric), 15 Vehicular Gates, 20842 feet of Silt Fence, Type MS, 740 feet of Sediment Control Log, 8392 pounds of Fertilizer Type 3, 20636 SY of Rolled Erosion Prevention Category 25, 902 SY of Rolled Erosion Prevention Category 74, 24.6 acres of Seeding, 20.2 acres of Disc Anchoring, 1303 pounds Seed Mixture 25-141, 307 pounds of Seed Mixture 25-151, 40.5 tons of Mulch Material Type 1, 175 MGAL Rapid Stabilization Method 3, 2339 ft of Permanent Biofiltration Ditch System, and Traffic Control For SAP 012-630-001, a brief summary of major items of work include: Construction Surveying, Clearing and Grubbing, 794 feet of Remove Pipe Culverts, 58324 CY of Common Excavation (EV)(P), 25116 CY Common Borrow (EV)(P), Test Rolling, 42957 SY Full Depth Reclamation, 760 ft of CS Pipe Culverts (15", 18", 24") with aprons, 429 ft of RC Pipe (24", 36") with aprons, 88 tons of Class III Riprap, 181 tons of Class IV Riprap, 832 ft of Filter Berm Type 5, 12818 feet of Silt Fence, Type MS, 4365 feet of Sediment Control Log, 8140 pounds of Fertilizer Type 1, 7473 SY of Rolled Erosion Prevention Category 25, 20.4 acres of Seeding, 18.7 acres of Disc Anchoring, 202 MGAL Rapid Stabilization Method 3, 775 pounds Seed Mixture 25-142, 827 pounds of Seed Mixture 25-151, 99 pounds Seed Mixture 35-241, 37.5 tons of Mulch Material Type 1 and Traffic Control. Read carefully the Wage Rates as they affect this project. Site Directions: SAP 012-615-022: On CSAH 15 from West County Line to 2.476 miles east SAP 012-630-001: On CSAH 30 from North County Line to 2.775 miles south

Post-Bid

Bridges / Tunnels

$2,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

259

12

2

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
15
Bidding Soon
313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 2, 2022

Project location map

Multiple Locations, Montevideo, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.