BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Spearfish, South Dakota. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://www.bhpioneer.com/local_news/public-meeting-to-discuss-sandstone-hills-project/article_71ffd124-32e5-11ed-b9e5-cf0d691becfe.html There will be a meeting held Thursday to update the public on the Sandstone Hills street repair and sewer upsize project. The meeting will take place at 5:30 p.m., in the council chambers at Spearfish City Hall, located at 625 N. 5th St. For more information, or to submit a question or comment, contact the Spearfish Public Works Department at (605) 642-1333. _________________________________________________________ https://www.bhpioneer.com/local_news/public-meeting-for-sandstone-hills-street-repair-project/article_4eaf016c-9e3f-11ec-b39f-c3268f69cd60.html SPEARFISH -- A Public Meeting is scheduled for 5:30 p.m., Wednesday in the Council Chambers at City Hall, located at 625 N. 5th St., to discuss upcoming street work in the Sandstone Hills subdivision. Street repairs and asphalt paving are scheduled on Sandstone Hills Dr., Iron Horse Loop, and Windmill Dr. Additionally, the sanitary sewer line is scheduled to be upsized on Sandstone Hills Dr. from Windmill Dr. to Colorado Blvd. The work includes asphalt patching, crack repair, asphalt mill and overlay, and replacing portions of curb, gutter, sidewalk, valley pans, and ADA ramps. GTI Companies Inc. and their contractors are scheduled to begin work today, with work on replacing concrete curb and gutter sections beginning on Windmill Dr. Parking and/or pedestrian access may be blocked off in the area of work. Both directions of traffic will be maintained during this phase. The public meeting will provide more information on closures and detours during various phases of the work. Throughout different phases of the project residents will be required to use Exit 14 to gain access to Colorado Blvd. Officials urge caution and reduced speeds when passing the construction zone and follow all construction signage. _____________________________________________________________________________________________________________________________ Mill & overlay, ADA curb ramp updates, replace damaged curb & gutter, replace damaged fillet sections, sanitary sewer upsize, and replace sanitary sewer manholes. A Performance and Payment bond in the amount of one-hundred percent (100%), A Maintenance Bond in the amount of ten percent (10%) of the final project cost

Post-Bid

Roads / Highways

$1,569,460.00

Public - City

Paving, Site Work

61

14

2

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
62
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

March 7, 2022

img_map_placeholder

Sandstone Hills Dr, Spearfish, SD

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.