Site work and paving for a mixed-use development in Salem, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 20, 2021 the contract was awarded to Donald Maggi, Inc. of Rolla, Missouri in the amount of $382,114.50. The start and completion date has not yet been determined. Project consists of the construction of 8,641 LF of 3"SDR 13.5 HDPE sewer force main; plug valves, combination air release valves; wet well; valve vault; concrete encasement; highway crossing bore; project shall also include construction of grinder pumps with owner supplied equipment package; all necessary thrust blocks, fittings, tees, and appurtenances; erosion control and riprap lined channel. A complete digital set of the bidding documents are available for a non-refundable fee of $75.00 Download delivery fee is $75.00, file size is 33.3 Mb. An additional amount of $50.00 will be charged for mailing of bidding documents. The Owner reserves the right to reject any or all bids, to waive informalities or irregularities, and to determine the lowest responsive and responsible Bidder, and to award the contract on that basis. Bid Envelope must state "Salem Hwy. J-72 Sewer Extension". Each bidder must submit a bid security in the amount of five percent (5%) of their total bid. The prevailing hourly rate of wages, as determined by the Industrial Commission of Missouri, will be complied with on this project, and not less than the prevailing hourly rate of wages as found by the agencies or Court of Appeals shall be paid to all workmen performing work under this contract. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. The Contractor shall begin assembly of materials and equipment within ten (10) days after receipt from the Owner of executed copies of the contract, The Work shall be substantially complete within 180 consecutive calendar days after the commencement date of the Contract. The Work shall be completed and ready for final payment in conformance with Article 14 of the General Conditions within 210 days after the commencement date of the Contract.

Award

Roads / Highways

$382,114.00

Public - City

Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
43
Bidding Soon
794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2021

May 10, 2021

Project location map

MO-72, Salem, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.