BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Ventura, California. Completed plans call for site work for a municipal facility.

Project consists of sand removal, hauling, deposit, grading, and appurtenant work as shown on the plans with Drawing No. 2021-D-051. The Engineer's Estimate of cost is $150,000 for two phases of work. The bidder's proposal includes two Schedules of Work and Prices for the two phases of construction to be performed in Fiscal Year 2021/ 2022. The work shall be performed in November of 2021 (Phase 1) and May 2022 (Phase 2). Prices bid shall be held for both Schedules of Work and Prices. The Contractor shall have the option to extend the Contract for one year at a time, up to four years total for Fiscal Years 2022/2023, 2023/2024, 2024/2025 and 2025/2026. Hardcopy formats and electronic medium format (CD) can be mailed by CyberCopy to the prospective bidders ($15 for shipping and handling). The cost to obtain plans and specifications in any specified format herein is non-refundable The City reserves the right to retain all bids for a period of 60 days for examination and comparison, and to delete any portion of the work from the contract. The City reserves the right to reject any and all bids and to waive any informality in such bids. Mobilization shall consist of preparatory work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site. Mobilization shall additionally include the establishment of any temporary facilities and the submittal of a detailed construction schedule and other submittals that are required by the City before mobilizing onto the work site. The project site is defined as the Pierpont "Lanes", narrow streets leading from Pierpont Blvd. or Monmouth Drive toward the beach from San Pedro Street to Greenock Lane. The scope of this project includes grading/contouring sand, and removing and hauling excess beach sand at the end of up to twenty-seven (27) Lanes of the Pierpont Beach neighborhood as well as the sand along the frontage of up to sixteen (16) private properties, as shown on the Plans and as directed by the Engineer. The sand removal and grading are within the City's 40-foot right-ofway, as shown on the Plans, that stretches approximately one mile along Pierpont Beach between San Pedro Street and Greenock Lane. There are existing storm drains, manholes and waterlines within the right-of-way. The buried pipes are several feet below the excavation limits of this project. The Contractor shall haul the sand from the Lanes to sand deposit sites as shown on the Plans and as directed by the Engineer. At deposit sites, the Contractor shall spread the sand evenly within the boundaries shown on the plans and as directed by the Engineer. The bidder's proposal includes two Schedules of Work and Prices for two phases of work that will be performed in November of 2021 (Phase 1) and May of 2022 (Phase 2). Prices bid shall be held for both phases. The Contractor will have the option to extend the Contract for one year at a time, up to four years total.

Award

Municipal

$119,402.00

Public - City

Site Work

7

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
136
Bidding Soon
2,421
All Active Projects
1,045
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 2, 2021

November 1, 2021

November 23, 2021

img_map_placeholder

Multiple Locations, Ventura, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.