Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Montrose, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of May 13, 2021. the project has been awarded to Skip Huston Construction in the amount of $699,269.70 for asphalt patching work and a construction contract to A-1 Chipseal Company in the amount of $318,400.24 for slurry seal surface treatments for a total of $1,017,669.94 During the course of this request process, from issuance until a recommendation for award, Bidders shall not initiate contact related to this request with anyone other than the officially designated individual: For this bid the contact is Ryan Cushenan at (970) 240-1485 or email: rcushenan@ci.montrose.co.us All questions regarding this Request for Proposal shall be directed to the individual listed above. All inquiries shall clearly identify the name of the firm and the authorized representative, the RFP number and title. The deadline for receipt of questions from Bidders in regards to this RFP is 12:00 noon on March 25, 2021. Responses will be prepared by the City in an addendum and published on the City of Montrose web site at: www.cityofmontrose.org under Department Services, Purchasing, Open bids, under this bid name. The responses in writing are the only official answers. The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Moving Montrose Forward 2021 Pavement Maintenance Project in accordance with the project plans and specifications. This work includes, but is not limited to, the following key task The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Moving Montrose Forward 2021 Pavement Maintenance Project in accordance with the project plans and specifications. This work includes, but is not limited to, the following key tasks. A. Perform asphalt patching to include saw cutting or wheel rolling to a neat line, asphalt removal within patch areas, overexcavation and replacement of base soils where required, and asphalt replacement. B. Design and apply slurry seal surface treatment. C. Re-establish pavement markings. D. Implement stormwater management, traffic control (incl. traffic control plans), site security, site restoration, incidental surveying, and quality control testing as required to complete the work in accordance with the plans and specifications. The City of Montrose has appropriated $870,000 in streets funds for construction of the 2021 Moving Montrose Forward pavement maintenance project. The project will utilize all of the street funds, expanding or reducing the street scope of work as appropriate. Because of this set budget, the project does not include a contingency line; if the project is trending over the contract amount of $870k, the project scope will be reduced accordingly to keep it within budget.
Award
Roads / Highways
$1,017,670.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 30, 2021
April 29, 2021
November 15, 2021
Multiple Locations, Montrose, CO
Related To This Project
Montrose, CO
Bid Date: Jul 01 2020
Montrose, CO
Bid Date: Jan 25 2021
Montrose, CO
Bid Date: Dec 07 2020
Montrose, CO
--
Montrose, CO
Bid Date: Sep 11 2018
Montrose, CO
Bid Date: Jul 18 2019
Montrose, CO
Bid Date: Apr 22 2019
Montrose, CO
Bid Date: Aug 26 2021
Montrose, CO
Bid Date: Aug 25 2021
Montrose, CO
Bid Date: Dec 16 2021
Montrose, CO
Bid Date: Oct 26 2021
Montrose, CO
--
Montrose, CO
Bid Date: Apr 15 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--