BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Montrose, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of May 13, 2021. the project has been awarded to Skip Huston Construction in the amount of $699,269.70 for asphalt patching work and a construction contract to A-1 Chipseal Company in the amount of $318,400.24 for slurry seal surface treatments for a total of $1,017,669.94 During the course of this request process, from issuance until a recommendation for award, Bidders shall not initiate contact related to this request with anyone other than the officially designated individual: For this bid the contact is Ryan Cushenan at (970) 240-1485 or email: rcushenan@ci.montrose.co.us All questions regarding this Request for Proposal shall be directed to the individual listed above. All inquiries shall clearly identify the name of the firm and the authorized representative, the RFP number and title. The deadline for receipt of questions from Bidders in regards to this RFP is 12:00 noon on March 25, 2021. Responses will be prepared by the City in an addendum and published on the City of Montrose web site at: www.cityofmontrose.org under Department Services, Purchasing, Open bids, under this bid name. The responses in writing are the only official answers. The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Moving Montrose Forward 2021 Pavement Maintenance Project in accordance with the project plans and specifications. This work includes, but is not limited to, the following key task The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the Moving Montrose Forward 2021 Pavement Maintenance Project in accordance with the project plans and specifications. This work includes, but is not limited to, the following key tasks. A. Perform asphalt patching to include saw cutting or wheel rolling to a neat line, asphalt removal within patch areas, overexcavation and replacement of base soils where required, and asphalt replacement. B. Design and apply slurry seal surface treatment. C. Re-establish pavement markings. D. Implement stormwater management, traffic control (incl. traffic control plans), site security, site restoration, incidental surveying, and quality control testing as required to complete the work in accordance with the plans and specifications. The City of Montrose has appropriated $870,000 in streets funds for construction of the 2021 Moving Montrose Forward pavement maintenance project. The project will utilize all of the street funds, expanding or reducing the street scope of work as appropriate. Because of this set budget, the project does not include a contingency line; if the project is trending over the contract amount of $870k, the project scope will be reduced accordingly to keep it within budget.

Award

Roads / Highways

$1,017,670.00

Public - City

Paving, Site Work

7

1

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
20
Bidding Soon
247
All Active Projects
102
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 30, 2021

April 29, 2021

November 15, 2021

img_map_placeholder

Multiple Locations, Montrose, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.