Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2021 at 8:00 PM
Updated October 24, 2025
Site work and paving for a road / highway in Lincolnshire, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The proposed project consists of asphalt in various locations for the Village of Lincolnshire, Village of Golf, City of North Chicago, Village of Lakemoor, Village of Riverwoods, Village of Round Lake Beach, and the Village of Volo. All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals. Village of Lincolnshire Marc Facchini Public Works Management Analyst Published in Daily Herald March 16, 2021 (4560151) The work to be performed under this contract shall consist of furnishing all labor, machinery, tools, materials, and equipment necessary to complete hot mix asphalt patching at various locations in the Village of Lincolnshire, Illinois; Village of Golf, City of North Chicago; Village of Riverwoods , Illinois, Village of Volo, Illinois, Village of Lakemoor , Illinois, Village of Wilmette . This work includes milling the existing pavement to the specified depth and the installation of leveling binder and surface course as required. All work in the Village of Lincolnshire shall be completed by July 2, 2021. All work in the Village of Golf shall be completed by July 2, 2021. All work in the Village of Volo shall be completed by August 31, 2021 All work in the Village of Lakemoor shall be completed by September 30, 2021 All work in the Village of Riverwoods shall be completed by September 1, 2021 All work in the City of North Chicago shall be completed by October 31, 2021 All work in the Village of Round Lake Beach shall be completed by September 30, 2021
Award
Roads / Highways
$711,640.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 6, 2021
May 6, 2021
Multiple Locations, Lincolnshire, IL
Related To This Project
Lincolnshire, IL
Bid Date: Dec 10 2025
Lincolnshire, IL
Bid Date: Dec 17 2025
Lincolnshire, IL
Bid Date: Dec 17 2025
Lincolnshire, IL
Bid Date: Dec 22 2025
Lincolnshire, IL
Bid Date: Jan 06 2026
Lincolnshire, IL
Bid Date: Oct 21 2025
Lincolnshire, IL
Bid Date: Sep 03 2025
Lincolnshire, IL
Bid Date: May 19 2021
Lincolnshire, IL
Bid Date: Jun 30 2025
Lincolnshire, IL
Bid Date: Jun 13 2025
Lincolnshire, IL
Bid Date: Jun 12 2025
Lincolnshire, IL
--
Lincolnshire, IL
Bid Date: May 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
