BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2022 at 7:00 PM

Updated November 15, 2023

Site work, paving and new construction of a bridge / tunnel in Stockton, Alabama. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of January 10, 2021, an engineer has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: Questions regarding this information shall be directed to Wanda Gautney, Baldwin County Purchasing Director at wgautney@baldwincountyal.gov Questions must be received no later than April 9, 2021 at 2:00 pm CDT. The Baldwin County Commission is seeking qualifications from engineering/environmental/ design firms for a new pedestrian bridge which will connect Bicentennial Park and Live Oak Landing. The proposed pedestrian bridge is approximately 1,100 feet long. It will cross Flat and Raines Creek as well as significant wetland areas. This bridge will be straight, with no turns, and will be used primarily by pedestrians and bicyclists but will also have the ability to transport light equipment such as lawn mowers and ATVs. The path should be 10 feet wide with a 20-foot by 20-foot observation deck near the center of the bridge to facilitate environmental and educational viewing opportunities. The north end of the pedestrian bridge will be at Bicentennial Park and the south end will be at Live Oak Landing. Both ending points are undeveloped and wooded. The design should include educational identification marks and signs/maps located on the north and south ends of the bridge. The scope of services to be performed by the engineering/design firm shall include but not be limited to the following: * Engineering and designing of the pedestrian bridge as described above. * Attend necessary meetings and make presentations at the request of the County. * Provide detailed and timely schedules throughout the approved contract time period. * Provide any additional information the County may need in relation to the project. * Provide one contact person to coordinate project information. The County reserves the right to reject all Statements, negotiate further with any entity submitting Statements, seek additional Statements, or waive any irregularities or informalities in the RFQ process. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$600,000.00

Public - County

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
0
Bidding Soon
452
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2022

Project location map

51233 AL-225, Stockton, AL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.