BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2021 at 7:00 PM

Updated August 9, 2025

Site work for a water / sewer project in Tuscaloosa, Alabama. Completed plans call for site work for a water / sewer project.

Water Meter Replacements: Principal items of work include the purchase of the following: two thousand (2,000) 5/8"x3/4" automatic radio read water meters; fifteen (15) 1" automatic radio read water meters; twenty-five (25) 2" automatic radio read water meters; five hundred (500) standard water meter boxes; five (5) traffic rated water meter boxes; five (5) jumbo water meter boxes; two thousand (2,000) 3/4 " curb stops; two thousand (2,000) 3/4 " dual check valves; Radio-read system with computer hardware and software; and other related items. New Water Mains: Principal items of work include the installation of the following: eleven thousand five (11,500) LF of 6" PVC water main; three thousand forty (3,040) LF of 3" PVC Water Main; two thousand (2,000) LF 8" HDPE Water Main, HDD bored; eight hundred (800) LF " HDPE water main, HDD bored; and other related items. Plans and Specifications may be examined at the South Crenshaw County Water Authority; 8338 Brantley Highway; Brantley, Alabama 36009. To be eligible for consideration, bids must be submitted on complete proposals made available by the Owner. The Owner reserves the right to reject any or all bids and to waive any informalities. Each bidder must submit with his bid, security in the amount, form, and subject to the conditions provided in the Information for Bidders. The successful bidder will be required to submit a 100% performance bond and a 50% payment bond. Each bidder must be licensed as a Contractor in the State of Alabama in accordance with provisions of Chapter 8 of Title 34 of the Code of Alabama, 1985, and must submit with his bid satisfactory evidence of such license. Bidders will not be required to prequalify. Proposed Total DBE/MBE Participation: $ ________________ Percentage: ____% Goal: 2.5% The project objectives for utilization of Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs) are as follows: Commodities (Supplies) Contractual (Services) Equipment Construction MBE 4% MBE 8% MBE 5% MBE 2.5% WBE 11% WBE 30% WBE 20% WBE 3% For purposes of clarification: This objective applies to any Federally assisted procurement agreement in excess of $10,000. This objective necessitates three responsibilities; separate solicitations must be made of small and minority and women's business enterprises

Post-Bid

Water / Sewer

$600,000.00

Public - City

Site Work

3

9

2

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
75
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2021

January 3, 2022

Project location map

Multiple Locations, Tuscaloosa, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.