Renovation of a water / sewer project in Marlborough, Massachusetts. Completed plans call for the renovation of a water / sewer project.

**As of May 26,2021 This project has not yet been awarded. A timeline for award has not yet been established.** John J. Carroll Water Treatment Plant SCADA System Improvements. Contractor Category: Electrical. HVAC; Fire Protection Sprinkler System Contractor Qualification DCAMM Certificate A. The Work includes replacement of the Authority’s existing SCADA system at the John J. Carroll Water Treatment Plant located at 84 D’Angelo Drive, Marlborough. 1. The Authority has received approval of a waiver from DCAMM to conduct a twostep process that includes the prequalification of Electrical General Contractors due to the fact that the Contract Documents for the work contain Security Sensitive Information (SSI). The Electrical General Contractor will be required to have SSI protocols in place to protect all SSI in accordance with Section 01550 - SSI Document Control and will be required to execute a Confidentiality Agreement and External Nondisclosure Agreement. Filed Subbids are not considered security sensitive. 2. The Contractor, Subcontractors, manufacturer’s representatives, and any other personnel at the Site shall comply with all Federal, State or local requirements, laws, rules, regulations, procedures, orders or guidance related to COVID-19 and in accordance with Section 01390 - Health and Safety Plan. B. The scope of this project is to upgrade legacy instrumentation and control system components at the JJCWTP. The plant is in operation 24/7/365 and it is not possible to take control equipment offline without disruption to plant operations. The scope of the project is to build-out a new control system in parallel to existing equipment and facilitate a staged cutover while maintaining the plant operations throughout. C. The Work includes furnishing materials, equipment, tools and labor necessary to provide architectural, structural, HVAC, Fire Protection, electrical, and instrumentation upgrades as indicated on the Contract Drawings and specified herein. D. If equipment or system fail to meet contract requirements and additional Work is required, the Work shall be completed at no additional cost to the Authority and the Contractor shall inform the Authority in writing that the system is again ready for Checkout/Testing. Carroll Water Treatment Plant (CWTP) SCADA System Improvements Contract No. 7582 01011-2 E. Should any of the equipment/systems fail any of the tests, the test shall be repeated at no additional cost to the Authority until the equipment/systems pass.

Bid Results

Water / Sewer

$105,300.00

Public - State/Provincial

Renovation

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
643
Active Projects
260
Bidding Soon
4,801
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

June 14, 2021

Project location map

84 D'Angelo Dr, Marlborough, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.