BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2021 at 8:00 PM

Updated November 27, 2025

Site work for a bridge / tunnel in Petty Harbour, Newfoundland. Completed plans call for site work for a bridge / tunnel.

Closing Time: 2:00 P.M. (NT) ** Please note that there has been 1 addendum issued for this project. ** The work includes but is not limited supply and installation of new 2921mm x 4343mm aluminum structural plate arch culvert, downstream headwall, and remediation of the ocean side armour stone. The work also includes reinstatement of road granulars, asphalt, and guide rail as shown on the design drawings.

Award

Bridges / Tunnels

$260,651.00

Public - City

Site Work

8

9

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2021

May 3, 2021

Project location map

To Be Determined, Petty Harbour, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.