EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 23, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Marion, Ohio. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

As of April 16 the project is anticipated to be awarded on June of 2021. An addendum will be issued to provide these details 3 days prior to the originally schedule meeting date. Each Bid must be accompanied by a Bid Security pursuant to Chapter 1305 of the Ohio Revised Code, in the amount stated and payable to the order of the Owner. The Bid security shall be in the form of either A. A Bid Bond for the full amount of the Bid issued by a surety licensed to do business in the State of Ohio, or B. A certified check, cashiers check or letter of credit. Letter of credit shall be revocable only at the option of the Owner. The amount of the certified check, cashier's check, or letter of credit shall be equal to ten (10%) percent of the bid. Bids may be held by the City of Marion for a period not to exceed 90 days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. The right is reserved, as the City of Marion may require, to reject any and all bids and to waive any informality or irregularity in the bids received. The requirements of 49 CFR Part 26, Regulations of the U.S. Department of Transportation, apply to this contract. It is the policy of the City of Marion to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. A DBE contract goal of 1.4% has been established for this contract. This project is subject to the requirements of the Davis-Bacon Act as amended. The Contractor is required to comply with wage and labor provisions and to pay minimum wages in accordance with the schedule of wage rates established by the US Department of Labor. Award of contract is also subject to the following Federal provisions: Government-wide Debarment and Suspension. Foreign Trade Restriction 49 CFR Part 30. Buy American Preferences Aviation Safety and Capacity Act of 1990. Affirmative Action 41 CFR Part 60-4. furnishing all labor, materials and equipment, and performing all work necessary for RUNWAY 7-25 LIGHTING IMPROVEMENTS at Marion Municipal Airport The Owner has established a contract performance time of 33 consecutive calendar days from the date of the Notice-To-Proceed for all project work.

Award

Transportation Terminals

$309,425.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Erection, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Refrigerated Display Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Trenching and Backfilling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
71
Bidding Soon
1,450
All Active Projects
528
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2021

August 1, 2021

img_map_placeholder

1530 Pole Lane Rd, Marion, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Runway 7-25 Lighting Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.