Published June 8, 2021 at 8:00 PM

Updated June 5, 2025

Site work for a water / sewer project in Corpus Christi, Texas. Completed plans call for site work for a water / sewer project.

As of June 8, 2021 the project was awarded to Cayo, LLC with a bid amount totaling $5,704,725 as the Contractor for the Marina Breakwater and Boat Basin Dredging projects. The start and completion date has not yet been determined. The project scope of work includes: 1. Improvements to the southern portion of the breakwater adjacent to the downtown marina and McGee Beach. The pier at Bayshore Park extends from the seawall to the beginning of the breakwater. The breakwater consists of an elevated concrete cap over a rock base, eventually transitioning to an all rock section. The overall breakwater system provides wave sheltering for the marina. The proposed improvements include, but are not limited to, the following. a) Selective demolition of existing breakwater elements. b) Demolishing existing concrete stairs and patching concrete. c) Demolishing wooden handrails, light poles, patch concrete and concrete surface crack repairs. d) Constructing a new concrete cap on the breakwater. e) Filling Voids in existing breakwater riprap with concrete at breakwater base. f) Placing riprap to supplement the existing breakwater stone base for the new concrete cap that will be wider and higher than the original. g) Work in accordance with permit from the United States Army Corp of Engineers (USACE SWG-2019-00166) for the rehabilitation of the breakwater. USACE Permit has been obtained by the city for the project. 2. Proposed improvements to the marina adjacent to the breakwater by dredging on the marina side of the breakwater in two (2) locations to restore the marina basin floor to the original dredged elevations with new dredge contours tied into the adjacent contours of the basin floor. Transport and placement of dredged material to Port of Corpus Christi Rincon B West placement area and compliance with dredge material placement plans. 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%..

Award

Water / Sewer

$5,704,725.00

Public - City

Site Work

29

4

7

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
16
Bidding Soon
391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2021

June 1, 2021

Project location map

Multiple Locations, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.