Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Gig Harbor, Washington. Completed plans call for site work for a water / sewer project.
The City of Gig Harbor requests sealed bid proposals for construction services for the Community Paddlers Dock Project, CPP-1824. This project, as more completely described in the Contract Documents, generally include construction of the following: Furnishing all labor, tools, equipment, materials, incidentals, superintendents, subcontractor coordination and overhead to construct the Community Paddler's Dock project. The Contractor will be expected to field multiple crews simultaneously, if required to perform the work. Work of the Project involves the replacement of the existing gangway and float system as shown in the Contract Drawings, and any other miscellaneous elements required to complete the Work as shown on the Drawings. The project shall include all other Work and shall be constructed in accordance with the applicable Drawings and Specifications, as described in the Contract Documents. One hundred eighty (180) working days are allotted for this construction. Inquiries regarding the Project may be directed to the City's Construction Supervisor, George Flanigan by email at flanigang@cityofgigharbor.net. All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check or surety bond in an amount equal to five percent (5%) of the Base Bid total. Should the successful bidder fail to enter into such Contract and furnish satisfactory Performance Bond within the time stated in the Contract Documents, the bid proposal deposit shall be forfeited to the City of Gig Harbor. The City of Gig Harbor reserves the right to reject any or all bids and to waive minor irregularities in the bidding process. The City of Gig Harbor reserves the right to award this Contract to the lowest responsive, responsible bidder based on the Bid Proposal. In determining the lowest responsive, responsible bidder, consideration will be given to the criteria listed in RCW 39.04. No bidder may withdraw their bid proposal after the time fixed for opening thereof, or before award of contract, unless said award is delayed for a period exceeding ninety (90) calendar days.
Award
Water / Sewer
$758,726.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2021
August 12, 2021
3589 Harborview Dr, Gig Harbor, WA
Related To This Project
Gig Harbor, WA
Bid Date: Feb 21 2020
Gig Harbor, WA
--
Gig Harbor, WA
--
Gig Harbor, WA
Bid Date: Jan 20 2022
Gig Harbor, WA
Bid Date: Feb 15 2022
Gig Harbor, WA
Bid Date: Dec 22 2021
Gig Harbor, WA
Bid Date: Dec 08 2021
Gig Harbor, WA
Bid Date: Oct 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.