BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 22, 2021 at 8:00 PM

Updated April 18, 2025

Site work and outdoor lighting for a transportation facility in Greensboro, North Carolina. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.

All questions about meaning or intent of Contract Documents shall be submitted in writing (via email) with subject "Bid Question - PTIA Lighting Upgrade" to Russ Randall, PE of Walker Consultants, rrandall@walkerconsultants.com. All questions must be submitted by Friday, September 10, 2021 at 4:00 pm. Questions received after the due date will not be answered. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. No proposal may be withdrawn after the scheduled closing time for the receipt of bids for a period of 90 days. The Piedmont Triad Airport Authority reserves the right to accept or reject any bid, to reject all bids and re-advertise, or to reject all bids without further action, whatever the Authority deems to be in its best interest. Project consists of the following work. Refer to drawings for extent of the scope of work listed below. Project consists of providing all materials, labor, equipment, supervision, and services required to demolish existing light fixtures and conduit and installation of new LED light fixtures and conduits for the lower level short term parking areas. Work also includes replacing electrical distribution panels and equipment in accordance with the Contract Documents. 1. Provide electrical engineering as required for the Project and to obtain permits. 2. Provide temporary electrical facilities to facilitate construction. 3. Demolition, removal, and disposal of all lighting, conduit boxes, wiring, panels, lighting controls, etc. 4. Patching from demolition work 5. All conduit, boxes, raceways, wiring, etc. required for project for all systems. 6. Grounding as required per code conformance. 7. All electrical distribution equipment. 8. All interior and exterior lighting fixtures. 9. Lighting controls as indicated. 10. Identification and nameplates for all electrical equipment, panels, disconnects, etc. 11. All thru wall and floor conduit sleeves. 12. Complete shop drawings for all materials, systems, and equipment. 13. Installation instructions, operating manuals, spare parts lists, etc. for all materials, systems and equipment. 14. Record as-built drawings of all work installed under this contract. 15. Owner training. 16. Provide complete testing of all electrical systems and equipment. Submit certification that testing has been completed. 17. Provide complete arc flash study and labeling of new distribution equipment

Under Construction

Transportation Terminals

$395,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

20

9

7

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
296
Active Projects
168
Bidding Soon
2,197
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.