BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 8, 2022 at 7:00 PM

Updated November 15, 2023

Site work and new construction of a pre-engineered storage facility in Sturgeon Bay, Wisconsin. Completed plans call for the construction of a 422-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

1450733 Door County Highway Department - New Brine Facility A 450 square foot unoccupied salt brine producing addition. Summary Project Description: Building addition to house salt brine mixing equipment with exterior concrete slab for brine storage tanks. This includes, but not limited to precast concrete, structural framing, thermal & moisture protection, doors, finishes, fire suppression, plumbing, electrical, HVAC, and miscellaneous installations.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$256,975.00

Public - County

New Construction, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
36
Bidding Soon
373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

May 2, 2022

Project location map

1001 S Duluth Ave, Sturgeon Bay, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.