EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Inver Grove Heights, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Approximate quantities of major items of work are as follows: Clearing and Grubbing 16 TREE Remove Bituminous Pavement 3,100 SY Remove Driveway Pavement 350 SY Common Excavation 600 CY Aggregate Surfacing Class 2 450 TON Aggregate Base Class 5 550 CY Full Depth Reclamation 13,000 SY Bituminous Pavement 4,000 TON CS Pipe Culvert (15") 160 LF RC Pipe Culvert (15" - 18") 175 LF Riprap (CL II and IV) 10 CY Concrete Driveway 100 SY Seeding (Hydroseed) 1.1 ACRE Boulevard Topsoil Borrow 500 CY Silt Fence 11,000 LF Turf Reinforcement Mat Cat 2&4 200 SY. The bid bonds must be payable to the City of Inver Grove Heights in the amount of five percent (5%) of the amount of the vbid, to be forfeited as liquidated damages in the event that the vbid is accepted and the bidder fails to promptly enter into a written contract and furnish the required bonds. Immediately following expiration of the time for receiving bids, the City Engineer or his/her representative will publicly view vbids at City Hall, 8150 Barbara Avenue, Inver Grove Heights, MN. Prior to bid opening time stated above, vbids are effectively sealed and not allowed to be reviewed. The City of Inver Grove Heights reserves the right to reject any and all vbids, to waive any informality therein, and to adjourn the meeting to a later date for the purpose of further consideration of the vbids and taking action thereon. No vbid may be withdrawn within 60 days after the date of opening of bids. The City Council will consider award of contract at their regular meeting held at City Hall on Monday, May 10, 2021 at 7:00 p.m. in the Council Chambers at 8150 Barbara Avenue.

Award

Roads / Highways

$561,072.00

Public - City

Paving, Site Work

56

9

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
59
Bidding Soon
997
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

May 31, 2021

img_map_placeholder

Multiple Locations, Inver Grove Heights, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Pavement Management Program - Delaney Circle and Delaney Court Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.