Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 23, 2021 at 8:00 PM
Updated May 14, 2026
Site work and paving for a sidewalk / parking lot in Brevard, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
As of 7/23/2021 project was not yet been awarded. No estimated time frame yet. All electronic bids must be received before or by this time. Please make sure all electronic bids are signed and all required documents (listed below) are attached with your electronic bid. Applicable Licensure W-9 COI General Work Day Schedule for anticipated work start & completions Warranty on all work A list of references A. Resurface - areas marked Area A - About 160 sq. ft. $ Area C - About 72 sq. ft. $ Area D - About 260 sq. ft. $ Approximate sq. ft. listed above, please confirm measurements; we need a cost for each area listed above, scope listed below: Mill 1 1/2" of existing asphalt Apply hot tar TAC for bonding Resurface with 2" SB9.5C type hot mix compacted Re-stripe new paving B. Paving - this area is located in front of the trash dumpster Area B - 1269 sq. ft. $ Approximate sq. ft. listed above, please confirm measurements; we need a cost for each area listed above, scope listed below: Remove existing asphalt, excavate out Add a minimum of 4" ABC stone after compaction Grade, wet, and condition Pave with 2" SB9.5C type hot mix compacted, pavement thickness of 2" after compaction C. See the attached map for the parking lot- this job is to include everything listed below: Clean and Prep Hot crack filling- The size is up to 5/8 "cracks; any cracks wider than 5/8 inch will need the area stuffed with foam backer rod into the crack, then apply caulk or roll-type crack filler before the contractor applies seal coating. Sealcoating with a minimum 2 lbs. sand/gallon mix Striping- parking spaces - (white), handicap spaces - (white), crosswalks - (white) Construction areas will need to be barricaded with safety cones and or caution tape by the contractor. Construction area to be kept clean during construction and upon completion of the job. The contractor needs to supply a Porta John for the project. Areas will need to be sectioned off for work to be completed. Bids must be itemized into the following line items: Labor $ Materials $ Tax $ A material list must be included with the bid.
Post-Bid
Sidewalks / Parking Lot
$400,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2021
June 16, 2021
45 Oak Park Dr, Brevard, NC
Related To This Project
Brevard, NC
Bid Date: May 22 2019
Brevard, NC
Bid Date: Aug 14 2019
Brevard, NC
Bid Date: Apr 08 2026
Brevard, NC
Bid Date: Apr 08 2026
Brevard, NC
Bid Date: Mar 24 2026
Brevard, NC
--
Brevard, NC
Bid Date: Mar 11 2026
Brevard, NC
Bid Date: Feb 04 2026
Brevard, NC
Bid Date: Jan 27 2026
Brevard, NC
--
Brevard, NC
Bid Date: Jan 15 2026
Brevard, NC
Bid Date: Nov 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
