BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2021 at 7:00 PM

Updated April 8, 2024

Site work, paving and new construction of a mixed-use development in Louisville, Kentucky. Completed plans call for the construction of a 141,000-square-foot, two-story above grade educational facility; for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Plans call for the construction of a new middle school. As of November 2021, this project is under construction This project consists of the construction of a new middle school including a tornado storm shelter. The scope includes sitework, concrete footings, concrete flatwork, insulated concrete forms (ICF) walls, brick veneer, masonry walls, structural steel, open web steel joist, light gauge metal trusses, mechanical, electrical, and plumbing work, and metal stud & gypsum board partitions, flooring, ceiling, painting, and standing seam metal and modified bituminous roofing. The new school consists of approximately 141,000 s.f. on two floors. The exterior walls are ICF and concrete masonry units (CMU) with masonry veneer. Exterior windows are aluminum storefront. The main roof structure consists of steel deck over light gauge steel trusses. The storm shelter roof consists of a concrete slab over composite steel deck supported by structural steel beams. The second floor consists of a concrete slab over composite steel deck supported by open web steel joists and structural steel beams. Floor finishes include stained polished concrete, carpet, ceramic tile, and wood flooring. Interior walls are load-bearing and non-loadbearing CMU and metal studs with gypsum board. Wall finishes are paint and ceramic tile. Ceilings are suspended acoustical tile and gypsum board. Specialties include signage, an elevator, metal lockers, plastic-laminate-faced architectural cabinets, gymnasium equipment, tubular daylighting devices and tornado-resistant door assemblies. Site work includes grading, utilities, new asphalt parking and drives, sidewalks, landscaping, and drainage.

Under Construction

Educational

$35,170,000.00

Public - County

New Construction, Paving, Site Work

268

41

67

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
124
Bidding Soon
1,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2021

July 28, 2021

Project location map

2601 Echo Trail, Louisville, KY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.