BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2022 at 7:00 PM

Updated November 14, 2023

Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

As of January 13, 2022, this project has not yet been awarded. The project is expected to be awarded on February. The City is accepting bids from PREQUALIFIED contractors for: construction includes one 54" o.d. steel drilled drop shaft to a depth of approximately 140' below grade; a concrete vortex structure; a concrete bulkhead in an existing tunnel; approximately 900' of 8-feet i.d. cast-in-place concrete tunnel; installation of surface drainage collection piping and structures; and all other associated activities. Mandatory pre-bid meeting on 11/15/21 @ 2PM.

Bid Results

Water / Sewer

$12,544,300.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
83
Bidding Soon
770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2021

February 11, 2022

Project location map

Ehrhardt St, Charleston, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.