BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Los Gatos, California. Completed plans call for site work for a water / sewer project.

Department of Public Works Conference Room, for construction on Laurel Road in accordance with the specifications therefor, to which special reference is made, as follows: Laurel Road Storm Damage Repair Project PM 1.97 This project involves the construction of a steel beam pilewall with timber lagging retaining wall requiring earth excavation and backfill, drainage facilities, asphalt pavement replacement, metal beam guard railing, asphalt dike, erosion control and revegetation. The successful bidder shall furnish a payment bond and a performance bond. The Contractor shall possess a Class A license at the time that this contract is awarded. The Department of Public Works hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantage business enterprises will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Bidders are advised that, as required by federal law, the County of Santa Cruz is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprise (DBE). The DBE Contract Goal is 12 percent. in addition bidders shall provide documentation showing that adequate good faith efforts were made to meet the goal as required in the Special Provisions. Attention is directed to the Federal minimum wage rate requirements in the Proposal and the State general prevailing wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. Engineer's Estimated Cost: $250,000 to $300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$242,406.00

Public - County

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
76
Bidding Soon
1,414
All Active Projects
605
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2021

May 24, 2021

img_map_placeholder

Laurel Rd, Los Gatos, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.