Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 27, 2021 at 8:00 PM
Updated January 29, 2026
Renovation of a water / sewer project in Devers, Texas. Completed plans call for the renovation of a water / sewer project.
As of May 27, 2021. the project has not yet awarded, no time frame provided at this time. For Waste Water Treatment Plant Rehabilitation It is the intent and purpose of these contract documents to provide for improvements to the existing wastewater treatment plant. CONTRACTOR TO PERFORM ALL WORK AS INDICATED. This project will be funded by CDBG. This contract shall provide for the necessary labor, equipment, tools, materials, and all other related construction for the proposed project. SUMMARY OF WORK Base Bid 1. The contractor shall remove and replace existing clarifier mechanism including basin modifications, and electrical components. 2. The contractor shall provide surface preparation and coating of the clarifier steel tank basin, including all labor and equipment. 3. The contractor shall remove and replace existing clarifier inlet valves including and piping modifications. 4. The contractor shall remove and replace existing clarifier RAS Airlift Pump #1 including all labor and equipment and piping modifications. Additive Bids 1. The contractor shall furnish and install Chlorination room improvements including new chlorine equipment. 2. The contractor shall remove and replace existing digester RAS Airlift Pump #2 including all labor and equipment and piping modifications. Special Considerations 1. The contractor shall be fully responsible for maintaining sanitary sewer flows and treatment ability of the plant at all times. Contractor to sequence all work to ensure that all portions of the sanitary sewer treatment process are maintained to provide necessary treatment of all flows during construction. Contractor shall be responsible for furnishing and maintaining all necessary pipe, fittings, pumps, fuel, and personnel for flow bypass and diversion. 2. Contractor shall coordinate all shutdowns, bypass, flow diversion, and valve operations with City Staff 1 week prior to units being taken off-line or bypassed. A pre-bid conference will not be held on this project.
Post-Bid
Water / Sewer
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2021
May 20, 2021
To Be Determined, Devers, TX
Related To This Project
Devers, TX
Bid Date: Aug 01 2024
Devers, TX
Bid Date: Aug 03 2022
Devers, TX
Bid Date: Jan 05 2023
San Antonio, TX
--
Longview, TX
Bid Date: Feb 16 2026
San Antonio, TX
--
Alvin, TX
Bid Date: Feb 12 2026
Coppell, TX
--
Missouri City, TX
Bid Date: Feb 20 2026
San Marcos, TX
--
Livingston, TX
Bid Date: Feb 19 2026
Lewisville, TX
Bid Date: Feb 06 2026
Aubrey, TX
Bid Date: Feb 19 2026
Belton, TX
--
Katy, TX
Bid Date: Feb 12 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
