Published May 12, 2021 at 8:00 PM
Updated April 23, 2025
Demolition, site work and new construction of a residential development in Hialeah, Florida. Completed plans call for the demolition of a residential development; for the construction of a one-unit residential development; and for site work for a residential development.
Burned Unit #15 Reconstruction 6830 W 7th Ave Hialeah, FL 33014#21-6830-001 Requirements: 5% Bid Bond is required Consent of Surety (Original from a Surety Company stating that it will issue the necessary Performance and Payment Bonds should the bidder enters into a contract with the Authority). Contact Person: Miguel Hernandez, C.F.P. Coordinator (305) 888-9744 Ext. 1028 or miguel.hernandez@hialeahhousing.org (We are an equal opportunity housing provider. We do not discriminate on the basis of race, color, national origin, religion, sex, family status or disability) Services pursuant to this contract shall begin on within seven (7) calendar days of receipt of the Notice to Proceed from the Authority and shall end no later than Ninety (90) calendar days after the notice has been issued, parties as provided for within this contract - Contractor shall furnish a detailed schedule of work to be performed to the Hialeah Housing Authority once a Notice to Proceed has been issued. - Contractor shall be responsible to properly notify tenant within 48 hours of commencing any work. Such notification shall be made in writing and properly placed in front door of tenant. In addition, the Contractor shall send a copy of the notification to the HHA (Hialeah Housing Authority). - Upon commencing any work, Contractor will be responsible to visit the job site and become familiar with the existing conditions of the building, including, but not limited to access routes, parking, delivery, and storage areas. If any conditions deviate from the overall scope of work, Contractor shall notify the HHA in writing within 7 calendar days prior to commencing work. -Contractor shall provide all labor, materials, equipment and shop drawings required to perform and complete the scope of work as specified in a work like manner. - Contractor shall acquire all necessary permits, pay all permit fees and pass all required inspections from the Building Department and/or the Hialeah Housing Authority. - All construction to be in accordance with all applicable local codes and ordinances and the Florida Building Codes. -Contractor shall be responsible to properly secure and protect the construction site from theft, vandalism and possible work-related damages to both existing structure and new construction. All path-up work performed shall match existing. - Contractors shall provide a safe working environment and comply, at a minimum, with OSHA standards to reduce and/or eliminate possible work related accidents. - Contractor shall be responsible to protect and safe guard against damages to all vehicles and landscape. If special arrangements need to be made, the Contractor shall notify the H.H.A. in writing within 7 working days prior to commencing work. - Contractor is solely responsible to make all necessary arrangements to properly secure their job site during hurricane season at their own expense. - Contractor is responsible to keep the job site free from accumulation of waste material and rubbish. Before the end of each working day, the Contractor shall inspect and clean-up any debris from the work area. Contractor shall remove and discard all construction debris from site at the completion of the scope of work specified and prior to the final inspection. - All work is subject to inspection by the Contracting Officer, Site Manager, Site Foreman, Maintenance Supervisor, and/or their appointee. They may require the Contractor to correct any defective workmanship or to replace any defective materials with no further cost to HHA, within 2-business days of notification of deficiency. - The Hialeah Housing Authority reserves the right to disqualify and/or terminate any Contractor at any time that does not meet all of the Hialeah Housing Authority's criteria and/or does not follow the specifications
Bid Results
Residential Subdivision
$83,950.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2021
June 9, 2021
6830 W 7th Ave, Hialeah, FL
Related To This Project
Hialeah, FL
Bid Date: May 15 2025
Hialeah, FL
Bid Date: May 27 2025
Hialeah, FL
Bid Date: May 28 2025
Hialeah, FL
Bid Date: May 23 2025
Hialeah, FL
Bid Date: Aug 20 2025
Hialeah, FL
Bid Date: Oct 29 2020
Hialeah, FL
Bid Date: Sep 04 2025
Hialeah, FL
Bid Date: Aug 26 2025
Hialeah, FL
Bid Date: May 15 2025
Hialeah, FL
Bid Date: May 15 2025
Hialeah, FL
Bid Date: Apr 18 2025
Hialeah, FL
Bid Date: Apr 18 2025
Hialeah, FL
Bid Date: Apr 09 2025
Hialeah, FL
Bid Date: Mar 25 2025
Hialeah, FL
Bid Date: May 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.