BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 4, 2021 at 8:00 PM

Updated May 7, 2025

Site work for a bridge / tunnel in Palm City, Florida. Completed plans call for site work for a bridge / tunnel.

The project involves repair of two 96" diameter Corrugated Metal Pipe (CMP) culverts under the Herbert Hoover Dike at the S-135 Pump Station. The project includes the use of a chemical grouting consisting of hydro-insensitive high density polyurethane polymers (HDPP) injected and pressure controlled through drilled ports that penetrate through the CMP at specified locations access from the culvert's interior. The project also includes installation of a cured-in-place pipe (CIPP) liner inside the two 96" culverts. Estimate: $2,142,200 - $2,361,776 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,873,500.00

Public - County

Site Work

165

1

12

10

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
91
Bidding Soon
1,338
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2021

July 2, 2021

Project location map

Multiple Locations, Palm City, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.