BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Palm City, Florida. Completed plans call for site work for a bridge / tunnel; water / sewer project; and road / highway.

This project is for the construction of 6.85 miles of canal connecting the C-23 canal to the C-44 Reservoir western reservoir perimeter seepage canal. This canal will require 2 culvert crossings, one beneath County Road 714, the other beneath Coca Cola Road, a spillway, an FPL service bridge and a 250-cfs pump station. For driving directions only call Addison Griesbaum at 304-376-4061 . *Kewit Infrastructure South Co requests bids by September 23, 2022, at 2:30pm*

Bid Results

Water / Sewer

$46,227,152.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
95
Bidding Soon
1,353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2022

October 27, 2022

Project location map

Multiple Locations, Palm City, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.