Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2022 at 8:00 PM
Updated December 6, 2025
Site work for a water / sewer project in Copper Harbor, Michigan. Completed plans call for site work for a water / sewer project.
Remove and replace the water distribution piping that serves the East Campground toilet/shower buildings and exterior fountains, check-in/contact station, day use area toilets and exterior fountains, concessions building, the Park Headquarters, Shop, Manager's Residence, Assistant Manager's Residence, and Crew Quarters. Salvage/reinstall or replace exterior water jug fillers, drinking fountains, and combination fixtures. Remove and replace the service laterals that serve all of the buildings and fixtures in the distribution piping replacement areas. Replacement of the distribution system will include necessary valves, vaults, air injection ports, shutoffs, backflow preventors connections to existing piping, and rigid board insulation of the piping in the trench. Two new wells were recently drilled near the Park Headquarters so this project will include installing pumps in them, a pressure tank for them in the shop, and connecting to the new Park Headquarters system. The crossings of US-41 and Fanny Hooe Creek will be abandoned to isolate the Headquarters as a standalone system. It is to be assumed that a minimum of 2" x 2" wide insulation is required along the entire length of waterlines that are open year round (due to depth) and areas where it is shallower will require 4" x 4" or 6" x 4" as shown in the typical details on the plans. Additions for these areas that require thicker insulation will be made with unit pricing provided with the bid. Some rock excavation will also be required. An allowance for an assumed quantity of 60 CY of rock excavation is to be included and additions or deducts from that allowance will be made with unit pricing provided with the bid. This rock excavation shall be performed on any portion of the line deemed necessary.. Directional boring of new lines in 2 locations is also required: under/into the East Campground Toilet/Shower Building and under/into the West Campground Toilet/Shower Building. The boring into the West T/S building is part of Alternate 1 as described below. All the above work items shall include all necessary work associated with the replacements including demolitions, saw cutting, removal, disposal, excavation, backfill, restoration, patching, protection, traffic control, etc. Water service will need to be maintained to portions of the system, during construction, as detailed in the phasing plan. Work will not be allowed to start prior to August 1, 2022. Testing and disinfection of the new water system will also be required. Also, the Owner will be providing an Archaeological Professional to monitor work during excavation of two area of the new waterline and the contractor shall comply and coordinate with the requirements of that monitoring. Those sections of waterline are approximately between stations 2+50 to 7+50 (Day Use Path), 8+50 to 9+50 (Cemetery), 20+00 to 20+75 (Soldier's Quarters), and 32+30 to 34+10 (Range Lightkeepers). Alternate 1 will be for all proposed work shown in the West Campground and Sanitation Station area. This includes removal and replacement of the water line between the West Campground Toilet/Shower building and the Sanitation/filling Station. It also installation of a new sanitary sewer system serving the Sanitation Station. This system consists of both gravity and force main sewer. The system requires a new grinder pump station, power to the station, a new manhole, and a new valve chamber. The complete Sanitation Station will be replaced including concrete, surrounding HMA, waterlines, RV filling station spigots, signage, and dump ports. ACCEPTING QUESTIONS UNTIL: 12:00 p.m. on Wednesday, April 13, 2022.
Award
Water / Sewer
$975,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2022
May 20, 2022
15223 US-41, Copper Harbor, MI
Related To This Project
Copper Harbor, MI
--
Copper Harbor, MI
Bid Date: Mar 15 2023
Copper Harbor, MI
Bid Date: Jul 24 2019
Copper Harbor, MI
Bid Date: Jun 12 2024
Copper Harbor, MI
Bid Date: May 05 2025
Whittemore, MI
Bid Date: May 26 2022
Midland, MI
--
Au Gres, MI
Bid Date: May 18 2022
Lansing, MI
Bid Date: Apr 12 2022
Lansing, MI
Bid Date: Apr 26 2022
Clinton Township, MI
Bid Date: Jun 09 2022
Detroit, MI
Bid Date: Jun 06 2022
Garden City, MI
Bid Date: Jun 09 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
