Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Mill Plain, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Constructing a compact roundabout at the intersection of SR 500 and NE 182nd Ave, full-depth pavement rebuild, grind and hot mix asphalt (HMA) inlay, HMA overlay, pigmented cement concrete pavement, curbing, guardrail, drainage, striping, new illumination system including new junction boxes, conduit, wiring, signing, channelization modifications throughout the project and other work. Involves 73 items and 31 working days. County : Clark County. Estimated value : $1,250,000 - $1,500,000. This is a Federally funded contract with a 18% disadvantaged business enterprise goal. WSDOT - SR 500, NE 182nd Ave Intersection Improvements *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$1,599,375.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2022
July 4, 2022
WA-500 & NE 182nd Ave, Mill Plain, WA
Related To This Project
Coulee Dam, WA
Bid Date: Apr 20 2022
Amanda Park, WA
Bid Date: Apr 21 2022
Port Orchard, WA
Bid Date: Apr 21 2022
Ephrata, WA
Bid Date: Apr 20 2022
Taholah, WA
Bid Date: Apr 29 2022
Ephrata, WA
Bid Date: Mar 22 2022
Lakewood, WA
Bid Date: Apr 26 2022
Bridgeport, WA
Bid Date: Mar 30 2022
Fife, WA
Bid Date: Apr 21 2022
Richland, WA
Bid Date: Apr 07 2022
Cougar, WA
Bid Date: Apr 14 2022
Bothell, WA
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.