EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in New Brighton, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project No. B2007492 Sealed proposals for furnishing of the necessary labor, materials, and equipment for the reconstruction of Old Highway 8 and 8th Avenue in New Brighton by the removal and replacement of the existing bituminous pavement, the removal and replacement of designated sections of concrete curb and gutter, storm sewer improvements, sanitary sewer improvements, signal system, improved pedestrian facilities, LED lighting, and landscape improvements which includes approximately: 16,500 SY Remove Bituminous Pavement 3,700 LF Remove Curb & Gutter 5,500 CY Common Excavation 8,000 TON Aggregate Base 6,000 TON Bituminous Mixture 2,200 LF 10" PVC Sanitary Sewer 600 LF Storm Sewer (12" RCP - 18" RCP) 4 EA Hydrant 15,000 SF Concrete & Bituminous Walk 4,000 LF Concrete Curb and Gutter 16 EA Street Lights 1 EA Signal System Plus miscellaneous and incidental work. All proposals shall be made on forms similar to those attached to and made a part of the proposed contract documents, and shall be addressed to: Craig Schlichting, P.E. City Engineer City of New Brighton 803 - Old Highway 8 NW New Brighton, Minnesota 55112 and endorsed with:(Name of Bidder) Old Highway 8 Intersection Improvements Each proposal shall be accompanied by a Non-Collusion Affidavit; a Responsible Contractor Certificate; an Equal Employment Opportunity Certification; and a certified check or bid bond made payable to the City of New Brighton in the amount of 5% of the bid as a guarantee that such bidder will enter into a contract with said City, in accordance with the terms of such letting and bid in case such bidder be awarded a contract. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The right is reserved to accept any bid, or to reject any or all bids. Furnish, install, maintain, and remove all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, "Temporary Suspensions". During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the contractor the value of the device as determined by the Engineer.

Award

Roads / Highways

$1,962,695.00

Public - City

Paving, Site Work

106

12

2

6

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Lighting, Exterior Lighting, Roadway Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Concrete Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Irrigation, Planting, Planting Preparation, Soil Preparation, Mulching, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
86
Bidding Soon
1,091
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2021

May 31, 2021

img_map_placeholder

Old Hwy 8 NW, New Brighton, MN


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Old Highway 8 Intersection Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.