BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 4, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a bridge / tunnel in Rochester, New York. Completed plans call for site work for a bridge / tunnel.

Furnish and install a Glass Fiber Reinforced Plastic Pipe liner system having a 27" x 59" outer diameter with specific pipe arch shape/profile as described in the attached plans which are Attachment A. The work includes slip lining, bulk heading and cellular grouting of the annual space between the host pipe arch and new pipe arch. The site is located on Phillips Road in the Town of Webster approximately 50 feet south of the Phillips Road/San Jose Drive intersection where 3 existing metal pipe arches convey storm water under Phillips Road.

Bid Results

Bridges / Tunnels

$410,000.00

Public - County

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
4
Bidding Soon
1,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2021

June 3, 2021

Project location map

To Be Determined, Rochester, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.