BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Champaign, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 4, 2021, this project has been awarded to Feutz Contractors Inc., in the amount of $1,376,790.70. For 2021 Infrastructure Maintenance Project The project includes the following work locations: Location No. 1 -Alley Maintenance: Approximately 400 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base. The east alley approach will also be reconstructed. Location No. 2 -North Campus Infrastructure Repair: Approximately 465 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base. The alley approaches will also be reconstructed. Location No. 3 -North Campus Infrastructure Repair: Approximately 330 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate sub base. The alley approaches will also be reconstructed. Location No. 4 -Brick Street Rehabilitation: Brick pavement patching will be performed. Sidewalk ramps will be reconstructed and deteriorated combination concrete curb and gutter and sidewalk will be removed and replaced.Location No. 5 -Sidewalk Rehabilitation: Sidewalk ramps will be reconstructed and deteriorated sidewalk will be removed and replaced. Location No. 6 -Sidewalk Gap: Approximatley 290 feet of sidewalk will be constructed on Broadmoor Drive. Approximately 255 feet of existing sidewalk will be removed and replaced between Devonshire Drive and McDonald Court. Location No. 7 -Mellon Building Sidewalk Replacement: Approximately 506 feet of sidewalk will be replaced on the south side of John Street and the west side of New Street. Location No. 8 -Parking Lot Improvements: The parking lot at the southwest corner of 2nd Street and University Avenue will be reconstructed with curbed islands, aggregate base course, and HMA resurfacing. Location No. 9 -Public Works HMA Resurfacing: Various areas at the Public Works Maintenance Facility will be resurfaced. For additional information, see Sections 2.18 and 4.7 of the bid documents, or contact Rachel Joy, Community Relations Manager and Compliance Officer, at rachel.joy@champaignil.gov. Each bid shall be accompanied by an acceptable form of Bid Guaranty in an amount equal to at least (10%), as a guarantee that if the bid is accepted, the bidder will execute the contract and all other Contract Documents and file acceptable contract bond and proof of insurance within fourteen (14) days after the award of the contract and prior to commencement of work. The City of Champaign, Illinois, reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the City. The criteria for selection of the lowest responsible bidder are set forth in Section 12.5-38 of the Champaign Municipal Code, 1985, as amended and the bid documents.To the extent required by law, the contractor shall comply with the Illinois Prevailing Wage Act, the Veteran's Preference Act, the Employment of Illinois Workers on Public Works Act, the City Equal Opportunity in Purchasing Ordinance and the Illinois Human Rights Act. If federal funds are used to finance this project, the contractor shall comply with the Davis-Bacon Act

Award

Roads / Highways

$1,376,791.00

Public - City

Paving, Site Work

88

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
53
Bidding Soon
505
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2021

May 17, 2021

img_map_placeholder

Multiple Locations, Champaign, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.