BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Champaign, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

Alley Maintenance: Approximately 350 feet of alley reconstruction will be performed providing a PCC pavement on an aggregate subbase. North Campus Infrastucture Repair: The east / west alley between First Street and the Boneyard will be reconstructed for approximately 150 feet providing a PCC pavement on an aggregate subbase. Sidewalk and Ramp Repairs: ADA accessible ramps will be placed and mid- block deteriorated sidewalk will be removed and replaced on John Street from Willis Avenue to Russell Street. Local Street Pavement Reconstruction: Deteriorated pavement will be removed and replaced at three locations. Pavement will be reconstructed on Healey Street from Wright Street to Sixth Street Clark Street Lighting Improvements: The existing lighting will be upgraded on Clark Street from Randolph Street to State Street, and also on Randolph Street from Clark Street to University Avenue. Deteriorated sidewalk on Clark Street will also be removed and replaced. Traffic Signal Upgrades: The work will be performed at the intersection of Prospect Avenue with Town Center Boulevard, the intersection of Randolph Street with Green Street, and the intersection of Neil Street with Market view Drive. Market Street HMA Resurfacing: Pavement will be resurfaced on Market Street from Marshall Street to North of Willow Street. The City of Champaign, Illinois, reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the City A utilization goal of 10% MBE (Minority Business Enterprise) and 5% WBE (Woman Business Enterprise). A workforce participation goal of 20% MBE and 15% WBE. Workforce participation goals refer to the percentage of minority and female individuals employed on a project. Bid Guaranty in an amount equal to at least TEN PERCENT (10%)

Bid Results

Sidewalks / Parking Lot

$2,663,380.00

Public - City

Paving, Site Work

207

4

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
53
Bidding Soon
505
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2023

May 17, 2023

img_map_placeholder

Multiple Locations, Champaign, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.