BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Sanger, California. Completed plans call for the renovation of a laboratory facility; and water / sewer project.

For Main Wastewater Treatment Plant (MWWTP) Admin, Lab, and Dewatering Buildings HVAC Improvements Work includes the following: Administration/Laboratory Building - Select demolition and replacement of existing 200 ton air cooled chiller, recirculation pumps, expansion tank and associated chilled water piping; select demolition of existing process chiller and replacement with 5 ton air cooled chiller; select demolition and replacement of 1,000 CFM exhaust fan and 1,000 CFM fumehood exhaust fan; demolition of existing built up roof and replacement with modified bitumen roof; installation of fall protection railing around perimeter of building roof; select demolition and replacement of chilled water pipe insulation within building's above ceiling space; installation of pipe supports on roof for future pipe; furnishing of temporary chiller to maintain building operation during construction; handling and proper disposal of debris and hazardous waste; and all required testing and training. Dewatering Building - Select demolition and replacement of 45,000 CFM roof mounted vane axial exhaust fan; select demolition and replacement of 47,300 CFM roof mounted vane axial exhaust fan; select demolition and replacement of 40,000 CFM supply fan located in building mechanical room; modification of fiberglass and sheet metal ductwork; installation of exhaust dampers on supply and exhaust grilles; installation of split system; rebalancing of building ventilation system; handling and proper disposal of debris and hazardous waste; and all required testing and training. Construction Estimate $4,410,000 to $4,900,000 Presented materials will be made available on the project website after the meeting. Pre-bid jobsite tours will be held in 60-minute sessions. This is the only time that the Main Wastewater Treatment Plant will be open for inspection. Each tour session will have a maximum of 4 contractors, with a maximum of 3 attendees per contractor, for a maximum of 12 attendees (Attendees) per session.

Award

Water / Sewer

$5,751,500.00

Public - County

Renovation

123

33

40

9

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
13
Bidding Soon
331
All Active Projects
163
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 26, 2021

July 15, 2021

img_map_placeholder

Multiple Locations, Sanger, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.