BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Rice Lake, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 04/30/2021 This project will not be awarded until May 11. Schedule is not set exactly but will mostly take place in July 2021. Description: Major Quantities on the Project Include: 1 LS Maintenance of Traffic 47,300 SY Remove Asphalt Surface Milling (2-inch) 500 SY Base Patching 6,000 Ton HMA Pavement 4 MT 58-34 H Fiber 3,400 Gal Tack Coat With Alternate Bid Items to Include: 29,000 SY Additional Remove Asphalt Surface Milling 3,500 Tons Additional HMA Pavement 2,100 Gal Additional Tack Coat 58,000 LF Pavement Marking Lines, Stop Bars, and Crosswalks (Epoxy Option) 50 Each Pavement Marking Words and Symbols (Epoxy Option) 58,000 LF Pavement Marking Lines, Stop Bars, and Crosswalks (Paint Option) 50 Each Pavement Marking Words and Symbols (Paint Option) Additional Description: Bid security in the amount of 10 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bidders Proof of Responsibility must be submitted to SEH in accordance with the Instructions to Bidders. Contractors on the Project shall be required to comply with the minimum wages in effect for the State of Wisconsin. Bids shall be directed to the Clerk-Treasurer, securely sealed and endorsed upon the outside wrapper, "BID FOR 2021 MAIN STREET IMPROVEMENTS." The City of Rice Lake reserves the right to accept or reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City.. A. The Work shall begin on or after July 6, 2021. B. The Work between South Street and Orchard Beach Lane shall not begin until on or after July 19, 2021, unless approval is received from the Owner due to the early completion of the associated South Main Street Drainage Improvements project. C. The overall Work, regardless of which alternates are selected for inclusion in the contract, will be substantially completed on or before August 6, 2021, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before August 10, 2021. Mill and Overlay of Main Street between Burton Street and Stein Street. Mill off 2 inches of existing asphalt and install a 2-inch HMA Pavement surface. Bid Alternates include a 2-inch mill and overlay of Main Street between the South City Limits and Burton Street, and pavement marking paint.

Bid Results

Roads / Highways

$823,452.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
621
All Active Projects
241
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2021

July 6, 2021

img_map_placeholder

Multiple Locations, Rice Lake, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.