EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 30, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Whitman, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work under this Contract consists of furnishing all necessary labor, materials and equipment required to provide pedestrian and traffic safety improvements along Park Avenue and at the intersection of Park Avenue and Essex Street. The work also includes reconstruction of existing cement concrete sidewalks, driveways, and curb ramps along the northern side of Park Avenue between Washington Street and Essex Street. Portions of the project identified in the plans as not having surveyed base plans shall be field designed by the Contractor to layout treatments to ensure ADA compliance and the appropriate grades along back of sidewalk as directed by the resetting of granite curb, installation of new granite curb, reconstruction and construction of new cement concrete sidewalk, driveway, and curb ramps, roadway full depth pavement reconstruction, mill and overlay, installation of signs and pavement markings, minor drainage modification work, and other miscellaneous items of work required to complete the project and as shown on the plans and described herein.

Bid Results

Roads / Highways

$543,860.00

Public - State/Provincial

Paving, Site Work

28

7

2

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management
Division 08 - Openings

Division 08 - Openings

Hardware
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
231
Bidding Soon
2,538
All Active Projects
1,192
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2021

May 24, 2021

img_map_placeholder

Park Ave & Essex St, Whitman, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pedestrian and Traffic Improvements at the Park Avenue and Essex Street Intersection

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.