BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2024 at 7:00 PM

Updated November 20, 2024

Demolition, site work, paving and new construction of a mixed-use development in Whitman, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for site work for a educational facility; and for paving for a educational facility.

As of November 4,2024, this project has not yet been awarded. A timeline for award has not yet been established. General Contractor and Filed Subcontractor Request for Qualifications for the Whitman Middle School project at 100 Corthell Ave,, Whitman, MA 02382. New construction of a 138,605 GSF middle school and associated sitework (utilities, parking, landscaping, etc.). Contractor Qualification DCAMM Certificate The Whitman Middle School project was voted by the MSBA to move forward with new construction. The project will be completed in 2 main phases, construction of the new building in phase 1 and demolition and site work in phase 2. The new Whitman Middle School will be located adjacent to the existing school in the current field. The new school will be 138,605GSF and will hold 675 students grades 5 through 8. Demolition of the old school and sitework will follow once students and faculty have moved into the new school. The Whitman Middle School consists of classrooms, offices, science labs, gymnasium, cafeteria, auditorium, media center, art and music rooms, and technology rooms. The new school consists of one 3-story building. The project also includes a new parking lot, landscaping, utilities, play fields and playground area. School will be in session throughout the duration of the construction project. The subcontractor is expected to be conscious of excessive noise and any disturbances to the school nearby, existing, and new Whitman Middle. The project is expected to have a construction duration of 32 months, approximately 18-22 months to build the new school and 8-12 months for demolition and sitework. Optional Site Visit There will be no optional site visit

Post-Bid

Educational

$105,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
185
Bidding Soon
3,793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

February 14, 2025

Project location map

100 Corthell Ave, Whitman, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.