BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Whitman, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a 138,605-square-foot, three-story above grade educational facility; for site work for a educational facility; playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; water / sewer project; and sidewalk / parking lot.

Request for Qualifications (RFQ) and invites qualified and experienced General Contractors and Filed Sub-Bid Contractors to submit a Statement of Qualifications (SOQ) to prequalify for the building of the new Whitman Middle School at 100 Corthell Avenue, Whitman, MA. The Filed Sub-Bid categories the Town is requiring to prequalify are: Masonry, Misc Metals, Waterproofing, Roofing, Metal Windows, Glass & Glazing, Tile, Acoustical Tile, Resilient Floors, Painting, Elevators, Fire Protection, Plumbing, HVAC and Electrical. Project Description: New construction project will be completed in 2 main phases, construction of the new building in phase 1 and demolition and site work in phase 2. The new Whitman Middle School will be located adjacent to the existing school in the current field. The new school will be 138,605 GSF and will hold 675 students grades 5 through 8. Demolition of the old school and sitework will follow once students and faculty have moved into the new school. The Whitman Middle School consists of classrooms, offices, science labs, gymnasium, cafeteria, auditorium, media center, art and music rooms, and technology rooms. The new school consists of one 3-story building. The project also includes a new parking lot, landscaping, utilities, play fields and playground area. Proposers shall examine all information and materials contained in and with this solicitation. Failure to do so shall be at the proposer's risk. The Town of Whitman reserves the right to waive any informalities or irregularities in the proposals received, or to reject any and all proposals, wholly or in part.

Post-Bid

Educational

$41,500,000.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
194
Bidding Soon
2,497
All Active Projects
1,213
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

November 1, 2024

img_map_placeholder

100 Corthell Ave, Whitman, MA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.