BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Stanton, North Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contractor shall furnish and pay the cost, including sales tax and all other applicable taxes and fees, of all the necessary materials not furnished by the OWNER and shall furnish and pay for all the superintendence, labor, tools, equipment and transportation and perform all the work required for the construction of all structures listed and itemized under the bid schedule of the Bidder's Proposal attached hereto in strict accordance with the General Conditions; Special Conditions, Governmental Requirements, the Plans, which include all maps, plats, blueprints, and other drawings and printed or written explanatory matter therein; the Specifications and Contract Documents as prepared by Interstate Engineering, Inc., herein called "ENGINEER", and any amendments thereto and such supplemental Plans and Specifications as may hereafter be approved. The OWNER may at any time, as the need arises, order changes within the scope of the WORK without invalidating the Agreement. If such changes increase or decrease the amount due under the CONTRACT DOCUMENTS, or in the time required for performance of the WORK, an equitable adjustment shall be authorized by CHANGE ORDER. The ENGINEER, also, may at any time, by issuing a FIELD ORDER, make changes in the details of the WORK. The CONTRACTOR shall proceed with the performance of any changes in the WORK so ordered by the ENGINEER unless the CONTRACTOR believes that such FIELD ORDER entitles him to a change in CONTRACT PRICE or TIME or both, in which event he shall give the ENGINEER WRITTEN NOTICE thereof within seven (7) days after the receipt of the ordered change. Thereafter the CONTRACTOR shall document the basis for the change in CONTRACT PRICE or TIME within thirty (30) days. The CONTRACTOR shall not execute such changes, pending the receipt of an executed CHANGE ORDER or further instruction from the OWNER, provided, that all such change orders must also be approved by the Federal Contracting Officer.

Bid Results

Roads / Highways

$101,629.00

Public - County

Paving, Site Work

42

6

4

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
78
All Active Projects
22
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2021

July 2, 2021

img_map_placeholder

Multiple Locations, Stanton, ND

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.