BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2024 at 8:00 PM

Updated April 5, 2024

Site work for a road / highway in Stanton, North Dakota. Completed plans call for site work for a road / highway.

The project is the construction of an engineered soil landfill cover, consisting of an 18" thick re-compacted soil barrier layer, a 12" thick vegetative rooting layer, and 6" thick suitable plant growth material (SPGM)/topsoil layer at the Mercer County Regional Landfill, located near Hazen, ND. The project scope of work consists of mobilization, clearing and grubbing, construction of 12,863 square yards of soil landfill cover, seeding, mulching, erosion control, construction soil compaction testing, and incidental items.

Award

Roads / Highways

$270,916.00

Public - County

Site Work

24

13

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
12
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

May 1, 2024

Project location map

Multiple Locations, Stanton, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.