BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Beaverton, Oregon. Completed plans call for the demolition of a educational facility; for the construction of a 300,500-square-foot, three-story above grade educational facility; and for site work for a educational facility.

As of April 30, 2024, construction is underway. Scope of Replacement: Construct a new High School building and associated facilities to support a 1500 student capacity. Replacing all buildings and facilities onsite, except for the cafeteria building and concession stand, and constructing new facilities. The new buildings must meet all Building Code requirements currently in place by all Agencies Having Jurisdiction (AHJ) and be in alignment with the District's educational specifications and technical standards. Replacement of Beaverton High School located at 13000 SW 2nd St, Beaverton, OR 97005. Beaverton High School is located in downtown Beaverton, west of Hall Boulevard and south of Farmington Road. The original building was constructed in 1916 and has been modified significantly over the years. The existing main building is intended to remain in place and occupied while a new building is constructed adjacent. Students and Staff will be transitioned into the new building once completed and the existing buildings will be replaced. Construction/Design Project Budget: The Maximum Allowable Construction Cost (MACC) is $210,800,000. Project Schedule: Schematic Design will commence in July of 2022. Design is estimated to be complete in the early Spring of 2024. Construction is anticipated to take place beginning in the spring/summer of 2024 and be completed by July 2026. The district must move students into the new building in Summer of 2026 prior to the demolition of the existing building. Begin Pre-GMP Service September 2022 through Winter 2022/2023 Establish GMP** Fall 2023 Construction Start Date April 2024 New Building Substantially Complete July 6, 2026 Includes Temporary Certificate of Occupancy All Construction Substantially Complete July 30, 2027 Final Completion December 2027

Under Construction

Educational

$253,000,000.00

Public - City

Demolition, New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
562
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2023

April 1, 2024

img_map_placeholder

13000 SW 2nd St, Beaverton, OR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.