Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2021 at 8:00 PM
Updated December 11, 2025
Site work and paving for a road / highway in Farmington, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
materials, equipment and/or services as specified below: ITEM: 2021 Road Overlay TRANSPORTATION CHARGES PREPAID Payment for materials, equipment or services (unless otherwise agreed) will be paid within thirty (30) days from delivery date. Acceptance of bid by the County Commission and notification of same will constitute a legal contract. Failure to supply the material, equipment of supplies in the manner specified will be held accountable. The County Commission of St. Francois County reserves the right to reject any or all bids for any reason deemed justifiable. Contractor will be responsible for providing the labor, materials, equipment, tools, supplies, employees, drivers and safety training and certification, insurance (including workers' compensation and general liability) for the Work described in this Notice, for the following proposed Work: District 1: Turley Mill1.8 miles, Copenhagen Rd.- 1.1 miles, Valley Forge Rd.-2.3 miles, Old Jackson Rd.- 2.5 miles, Busiek Rd.- 4 miles, and Pendleton Rd.- 5.5 miles. District 2: Hillsboro Rd.- 6.5 miles, Hazel Run Rd.- 4 miles, Coffman Rd.- 1.9 miles, and King School Rd.- 4.2 miles The work shall consist of a bituminous overlay on an existing asphalt surface. In the event that a road surface is not existing asphalt, the overlay preparation shall be agreed upon between the contractor and the Highway Administrator or Superintendent.
Post-Bid
Roads / Highways
$2,000,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2021
July 5, 2021
Multiple Locations, Farmington, MO
Related To This Project
Farmington, MO
Bid Date: Dec 02 2025
Farmington, MO
Bid Date: Jan 06 2026
Farmington, MO
Bid Date: Dec 02 2025
Farmington, MO
Bid Date: Oct 06 2025
Farmington, MO
Bid Date: Oct 01 2025
Farmington, MO
Bid Date: Aug 26 2025
Farmington, MO
Bid Date: Sep 18 2025
Farmington, MO
Bid Date: Sep 02 2025
Farmington, MO
Bid Date: Aug 08 2025
Farmington, MO
Bid Date: Aug 12 2025
Farmington, MO
Bid Date: Sep 02 2025
Farmington, MO
Bid Date: Jul 10 2025
Farmington, MO
Bid Date: Jun 26 2025
Farmington, MO
Bid Date: Jun 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
