Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2026 at 7:00 PM
Updated January 8, 2026
Renovation of a detention facility in Farmington, Missouri. Working plans call for the renovation of a one-story above grade detention facility.
**As of January 7th, 2026, bids were rejected. No definite date for the rebid.** The work consists of renovation of the roofs, masonry tuckpointing and lintel replacement at the Farmington Correctional Center. The project includes the complete removal and replacement of all existing roofs and roof penetrations at the Control Center (Cc) and Treatment Center Ii (Tc) buildings. The scope includes full roof system replacement down to the existing deck, installation of new curbs, roof drains, and roof hatches where applicable. All required flashing shall be replaced, and new metal cap flashing shall be provided at the Cc. POINT OF CONTACT: A. Designer: Introba Inc., Brad Pierce AIA, (314) 391-2188, email: brad.pierce@introba.com B. Project Manager: Fred L. Decker Jr, (573) 751-8521, email: Fred.Decker@oa.mo.gov
Final Planning
Jails / Prisons
$2,000,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 2, 2025
July 7, 2026
To be determined, Farmington, MO
Related To This Project
Farmington, MO
Bid Date: Jan 06 2026
Farmington, MO
Bid Date: Dec 02 2025
Farmington, MO
Bid Date: May 04 2021
Farmington, MO
Bid Date: Jan 29 2026
Farmington, MO
Bid Date: Jan 05 2026
Farmington, MO
Bid Date: Feb 05 2026
Farmington, MO
--
Farmington, MO
Bid Date: Oct 06 2025
Farmington, MO
Bid Date: Oct 01 2025
Farmington, MO
Bid Date: Aug 26 2025
Farmington, MO
Bid Date: Sep 18 2025
Farmington, MO
Bid Date: Sep 02 2025
Farmington, MO
Bid Date: Aug 08 2025
Farmington, MO
Bid Date: Aug 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
