BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Site work and paving for a mixed-use development in Farmington, Missouri. Completed plans call for site work for a clubhouse / community center; for paving for a clubhouse / community center; playground / park / athletic field; playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

The City of Farmington, Missouri, (hereinafter "City") is accepting competitive bids for seal coating, crack sealing, and striping at the Farmington Civic Center, Water Park and First State Community Center. The address is Two Black Knight Drive, Farmington, Missouri 63640. This identification and repair shall be pursuant to the Bid Specifications included herein. The bid price shall include the materials required for the project, as well as all labor, supervision, materials, tools, equipment, supplies, and appurtenances to perform the work. This request is to perform necessary repairs at the Farmington Civic Center, Water Park and First State Community Center parking surface to include the following: Site preparation should include: o Spraying of all vegetation in cracks with Roundup Quick pro Dry Instant Kill where applicable before job date. o Cleaning all cracks with compressed air, wire wheel routing, and hand work to ensure all loose debris is removed. o Cracks 3/16" or larger should be injected with Nuvo CS Type C crack sealant not associated with alligatored areas (does not include asphalt and concrete joints). o Prime oil spots, heat, and scrape the excess oil off the pavement, and apply Tarloc MPC Oil Spot primer to promote adhesion of the sealer. Application should be completed according to specs below: o Each coat should be able to cure sufficiently to accommodate traffic between coats. o Allowing the final coat to dry overnight under good drying conditions before allowing traffic. o Striping of lines should be reapplied to the existing application, unless otherwise noted. o Only paint approved that meets Federal Specification TTP115# or TTP19852B should be used and applied using commercial striping equipment. Protection and site considerations that should be met include the following: o All barricades will be supplied and set up prior to commencement of work and removed from the job site after completion of the project. o The City will be responsible for having all parking areas cleared of vehicles. o The lot at the Farmington Civic Center, Water Park and First State Community Center should be completed in stages, to allow for continued operation of the facility. The coordination for this can be done with the Parks and Recreation Director. Bids should include: o Design details, equipment details, labor, miscellaneous parts, and any other applicable fees. o The company should perform the installation. No subcontracting should take place unless specifically disclosed in the bid. o List three (3) completed projects for reference and the scope of work completed. o Warranty should be noted with all bids. The City reserves the right to: o reject any and all submittals, o amend or cancel the RFSB at any time, o waive any minor informalities or irregularities in the submittals, o revise the schedule as the City sees fit, and o enter into any agreement deemed by the City to be in its best interest.

Award

Sidewalks / Parking Lot

$30,255.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
92
Bidding Soon
1,259
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2025

September 29, 2025

Project location map

Multiple Locations, Farmington, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.