BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and new construction of a pre-engineered storage facility in Farmington, Missouri. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Sealed bids will be received by Wolf Creek Fire Protection District, for the construction of a Pre-Engineered Wood Building and Overhead Doors. Not less than the prevailing hourly wage rates, as determined by the State of Missouri,Division of Labor Standards, shall be paid all workers employed on this project. The District reserves the right to waive technicalities, to select any contractor filing a proposal, and to reject any or all bids.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
87
Bidding Soon
1,245
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

To Be Determined, Farmington, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.