BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a playground / park / athletic field in Farmington, Missouri. Completed plans call for site work for a playground / park / athletic field.

The Farmington R-7 School District is requesting proposals from qualified contractors for the Early Childhood Playground Surface Project. The project involves providing materials and/or installation of a playground safety surface for an area of approximately 6,400 square feet(80 ft x 80 ft) with a minimum 3-foot fall rating. Options include materials only, materials and installation (playground tiles), pour-in-place system, or playground turf system. The District reserves the right to reject any or all bids.

Award

Playgrounds / Parks / Athletic Fields

$86,681.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
80
Bidding Soon
1,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 8, 2025

Project location map

209 W College St, Farmington, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.