Published June 8, 2021 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Wolf Point, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reconstruction with widening on the existing roadway on the Jct Secondary 250-North project located in Roosevelt County. Work includes: grading, gravel, cold milling, PMS overlay, drainage, fencing, rumble strips, seal & cover and pavement markings. The project begins at RP 16.6 and extends north approximately 8.3 miles along State Primary Route 32/MT 13 to RP 25.0. The entire project is located within the Fort Peck Indian Reservation. Work is to be completed in 200 working days. MTDOT - 101 - JCT SEC 250 - North

Award

Roads / Highways

$13,440,741.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
3
Bidding Soon
46
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2021

April 18, 2022

Project location map

MT-13, Wolf Point, MT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed