EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 16, 2021 at 8:00 PM

Updated May 9, 2025

Renovation of an educational facility in Salt Lake City, Utah. Completed plans call for the renovation of a educational facility.

The University of Utah, on behalf of the College of Architecture and Planning is seeking a qualified General Contractor to provide Construction Services for a new elevator in the Architecture Building #37 located at 375 South 1530 East Salt Lake City, UT 84112. Proposed work consists of Select Demolition, See EDA diagrams for potential Areas of Disturbance and proposed phased timeline. New 4 stop elevator, ADA ramp and interior finishes. Removal of existing ADA lift in Bailey Gallery and UIT Infrastructure for the College WIFI Network Systems Upgrade. GC to maximize the work completed prior to August 20 and completion of the ramp buildout in the Bailey by Labor Day. The impact of the ramp on the first floor is to be completed by Aug 13, 2021. User Group request minimizing noise during class time, but specifically avoid activities likely to produce loud noise on Monday, Wednesday, and Friday afternoons (2PM-5PM.), from August 23 thru November 18, 2021. Architecture Bldg 37 - Cap Elevator and TI Q & A deadline: Apr 28, 2021 6:00:00 PM EDT All requests for information shall be in writing and directed to the Architect: Sophia Malik, EDA Architects Phone: 801-531-7600 Email: smalik@edaarch.com Construction Constraints: -Occupied buildings -Contractors needs to work in a "COVID" safe manner according to Salt Lake City Health Department guidelines and University Requited Guidelines. -Loud, disruptive demolition noise must occur June 2021. This includes concrete saw cuts, elevator shaft, ramp, saw cut through beams for HVAC, etc. See attached Diagrams of Areas of Disturbance. This would need to be coordinated with the GC and is not a proposed construction timeline. -Please see EDA Proposed Phased Timeline- Abatement is to be coordinated between GC and Architect, schedule listed in timeline can be adjusted based on current procurement timeline. All contractors responding to this procurement process must comply with, and require all of their subcontractors to comply with, the license laws required by the State of Utah. The University of Utah reserves the right to reject any or all submittals or to waive any formality or technicality in any submittal in the interest of the University.

Award

Educational

$1,162,325.00

Public - State/Provincial

Renovation

52

12

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Quality Assurance, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
21
Bidding Soon
629
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2021

July 5, 2021

img_map_placeholder

375 1530 E, Salt Lake City, UT

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Architecture Building 37 - Cap Elevator and Tenant Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.