BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Unalaska, Alaska. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of August 8 2022, the project has not been awarded as bids came in over the available budget. The work will include, but not be limited to, furnishing all labor, tools, select materials and performing all operations in connection with the Pyramid Water Treatment Plant - SODIUM HYPOCHLORITE ON-SITE GENERATION. The project replaces the existing gaseous chlorine dosing system with a new hypochlorite generation equipment. The City is providing the hypochlorite generation equipment, air blowers, water softener systems, brine tanks, hypochlorite tanks, dosing pumps, piping, instrumentation, electrical and other materials. The contractor is to supply select materials and install the hypochlorite generation equipment with all the interconnecting piping, tanks, valves, wires, and miscellaneous fittings necessary for a fully functioning system. Technical questions shall be directed in writing to the City of Unalaska at the email address Please email lgregory@ci.unalaska.ak.us to be placed on the Plan Holder List. All construction must be accomplished between fish processing seasons during periods of low domestic water demand and flow. The allowable window is after October 1, 2022 and before December 1, 2022 (Substantial Completion) to correspond with the low flow period. All Work shall be completed by December 15, 2022 (Final Completion). Besides staging and preparations, actual field Work is limited to the window defined above. Liquidated Damages. The OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that the OWNER will suffer financial loss if the work is not completed within the times specified above, plus any extensions thereof allowed in accordance with Article 11 of the General Conditions. These losses include inconvenience to the City, administration and inspection costs, loss of efficiency and general inconvenience to the public. They also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by the OWNER if the work is not completed on time. Accordingly, instead of requiring any such proof, the OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay the OWNER One Thousand Dollars ($1,000.00) for each day that expires after the time specified above for Final Completion and readiness for final payment.

Final Planning

Water / Sewer

$661,200.00

Public - City

Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
2
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

February 8, 2023

img_map_placeholder

To Be Determined, Unalaska, AK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.